DETAIL PROJECT
- Project
- PHE ONWJ - STC0885 IMR SAT DIVING Campaign 2013
- Client
- PHE ONWJ
- Location
- Offshore North West Java
- Duration
- 53 days
- Year
- November 2013
- Mode of Intervention
- Saturation Diving Services
- Water Depth
- 40-45m
WORKSCOPE SUMMARY
PHE ONWJ is undertaking a project involving two diving campaigns within the ONWJ PSC area. The intention is to perform repair and maintenance activities in line with the 2013/2014 Subsea Inspection (IMR) program. The scope of work will be carried out under the Subsea Platform, Pipeline Inspection, Maintenance and Repair with Saturation Diving contract STC 0885 between PHE ONWJ and OSI.
The scope of work includes, installation engineering review, procurement of consumables and installation of company supplied equipment and structures.The scope of work consisted of:
- SPM#4 Subsea Hose Replacement (2013)
- 24” APND TEE Encapsulated Clamp Installation (2013)l